Stone plastic flooring should not be directly exposed to rainwater or sunlight, and should be placed flat in a place with a room temperature of 20 ℃ or above. The ground or newly laid cement ground must be thoroughly dried before construction, generally requiring at least 30 days. If the ventilation is good, it takes more than 3 weeks. The cement floor must be powdered in the correct ratio of 1:3 and can only be stepped on after about 3 days. Special attention: Before the construction of stone plastic flooring, the ground should be measured. Only when the moisture content is below 40 points can construction be carried out. 40-60 points are special ground, and it is recommended to pave as small an area as possible before construction. Construction cannot be carried out beyond 60 points. You can place one or two pieces of stone plastic flooring flat on the ground, and after 6-12 hours, check if there is any moisture on the back of the flooring. Before construction, the ground must be thoroughly cleaned. If there are irregularities or other defects, they should be leveled or laid. When the ground is heavily polished, it should be painted from scratch.
Set the reference ink line according to the building, calculate the center point, measure 90 ° with a square to calculate the vertical bisector, and then use beans to mark the reference line. The modified floor adhesive should start from the center point of the reference line, and use a toothed steel scraper with water-based adhesive to modify one of the four sides to the starting point of the reference line (teeth should be dense and shallow). It is advisable to lay the stone plastic floor in about 20-30 minutes, and the modified area can be pasted in about 60 minutes. When making alterations, they should be uniform, and water-based adhesive should be semi pressure-sensitive adhesive. When pasting, only pressure can be applied to the stone plastic floor. After the water-based adhesive of the stone plastic floor is modified, wait for its moisture to evaporate slightly (about 20 minutes), and adopt the principle of light touch without sticking to the hand, that is, laying the stone plastic floor one by one from the center point along the baseline, aligning the stone plastic floor when laying, and placing it from top to bottom. Gently press around each stone plastic floor to make it fit the ground. When water-based adhesive overflows from the joint, please immediately wipe off the adhesive stuck to the floor with a damp cloth. If not wiped off immediately, it is difficult to handle after drying. Please pay special attention. (If the environment promises to use gasoline or diluent for scrubbing).
Analysis of Construction Methods for Stone Plastic Flooring
Trim the four sides of the stone plastic floor. The laid stone plastic floor must be placed on the last stone plastic floor that has already been laid, so that the two stone plastic floors completely match. Then, using the other stone plastic floor as a ruler, cut the opposite side along its edge with a utility knife while approaching the wall, break it along the cutting line, and lay it on the floor of the wall. At the end of the surrounding construction, the cut fragments should be cleaned up and then rolled along the drum to ensure that the remaining amount of unqualified stone plastic flooring is level, and then wiped clean with a damp cloth. If there is sticky dirt after a period of time, please carefully remove it with a small amount of loose perfume or decontamination oil, and then scrub it with clean water. After laying the stone plastic floor, remove all stains first, and then use acrylic resin wax to maintain the appearance and keep the stone plastic floor beautiful. During daily cleaning, it can be wiped with clean water. To maintain the shiny appearance of the stone plastic floor, regular waxing and maintenance with acrylic resin 2-3 times a month can keep the stone plastic floor shiny as new.
A simple cleaning and maintenance method for stone plastic flooring: Firstly, thoroughly clean all stains on the stone plastic flooring. If there is glue or sticky dirt, carefully and gently polish it off with neutral detergent and 3M red pumpkin cloth. Pour floor cleaner (please use according to the instructions) onto the stone plastic floor, use a waxing machine to polish off the dirt on the stone plastic floor, then use a dry mop to clean the dirty water, and then clean the floor with clean water (if there is no waxing machine, use other tools instead, be careful to polish off the dirt). After the ground is dry, pour the water-based wax onto a clean dry mop and evenly change the wax on the stone plastic floor. After waxing, it takes about 20 minutes to let the stone plastic floor surface dry, and then step on it. You can use an electric fan to blow and shorten the time. According to experience, it takes about 8 hours to fully dry after waxing. If heavy objects need to be moved, they can only be moved after the wax is completely dry, so that the stone plastic floor can remain shiny and beautiful.